Phase II: Cottonwood Dr and Adjacent Cul de Sacs
Improvements
Improvements to Cottonwood Drive and the adjacent cul de sacs include:
- Reconstructing the roads
- Improving the drainage
- Replacing the sidewalks and curb ramps to meet ADA standards
- Installing street lights to meet current standards
Schedule
August – September 2020 | Field Survey |
September – December 2020 | Preliminary Design |
Early January 2021 | Project Open House |
January 13, 2021, Wed., 4-8 pm | Project One-on-One Meetings / Open House Ike “Woody” Woodman Recreation Center |
January – February 2021 | Final Plans, Specifications, and Estimate |
March 2021 | Advertise & Bid Project for Construction |
Summer 2021 | Construction |
Open House January 8-12, 2021
Click HERE to see the information that was presesnted at the Online Open House.
Public Input
The project team wants to hear from you! Your feedback and comments are welcome at any time. We have several ways you can comment:
- Send us an email with your comments: tlockhart@dowl.com
- Write us a letter or give us a call. See our contact information below.
Also, be sure to sign up to be on the email list to receive periodic project updates.
Sign Up For Project Email Updates
Contacts
Tobias Lockhart, PE
Senior Civil Engineer
DOWL
9085 Glacier Highway
Juneau, AK 99801
(907) 209-4232
tlockhart@dowl.com
Brad Sontag
City of Valdez Project Manager
PO Box 307
Valdez, AK 99686
(907) 835-5478, Ext 8
bsontag@ValdezAK.Gov